Transportation Master Plan (2026)

Share Transportation Master Plan (2026) on Facebook Share Transportation Master Plan (2026) on X (formerly Twitter) Share Transportation Master Plan (2026) on Linkedin Email Transportation Master Plan (2026) link

Project Overview

Buena Vista is updating its Transportation Master Plan (TMP) to reflect current conditions, community priorities, and future growth. The existing plan was last adopted in 2004 and no longer represents how residents, businesses, and visitors move through Town today.

The updated TMP will become the Town’s primary transportation framework, guiding long-range planning, capital improvement investments, and development decisions. The plan will incorporate Complete Streets principles, ensuring that roads and transportation infrastructure are designed to safely and efficiently serve drivers, pedestrians, cyclists, and individuals of all ages and abilities.

This project is a planning effort only and does not include construction.

What We Heard

Public input was gathered over the course of 12 weeks, collected online through My-BV and in-person during two pop-up events at the library and one open house event held at the Community Center on July 9, 2026. The Town of Buena Vista also heard from local stakeholders during two stakeholder workshops in July. Overall, the Town heard from nearly 300 community members.

Image 1: Community outreach and engagement numbers.


Key Themes & Areas of Need

Community members shared their concerns and ideas for improvement by mapping their comments on the project website, through the 75 comments received, the project team identified 10 key themes or areas of need. The themes below are listed in order of importance based on the number of reoccurring/similar comments.

  • Bicycle & Pedestrian Safety: bike lanes, shared-use paths, complete sidewalks, safer and more visible street crossings, and safer walking/biking routes to schools, parks, trails and the downtown area.
  • Driver Behavior: concerns about excessive vehicle speed and drivers failing to yield to bikes and pedestrians.
  • Parking-Related Safety & Traffic Conflicts: concerns about on-street parking reducing visibility of bikes and pedestrians crossing the street and narrow travel lanes.
  • Dangerous Intersections: concerns about tight turning radii and creating unsafe mering and turning movements, along with the need for additional stop signs or signalized intersections in areas with more traffic.
  • Connectivity & Access: connecting bike lanes to multi-modal networks, need for north-south connectivity, and connecting existing trails and sidewalks.
  • Traffic Calming: need for lower speed limit and traffic calming measures, especially along Highway 24 as vehicles enter town limits.
  • Traffic Flow & Access Management: concerns about multi-direction access into popular businesses and emergency access needs.
  • Streetscape, Maintenance, and Accessibility: maintenance needed on trails, pathways, sidewalks, and bike lanes; reduce tripping hazards and repair uneven sidewalks.
  • Public Transportation: need for more local public transit and expansion of Bustang service.
  • Growth Management, Open Space, & Community Character: future development and transportation projects should continue to preserve open space and wetlands, along with avoiding urban sprawl.

Transportation Corridors

When thinking about future growth and transportation improvements, community members were asked to rank a list of key corridors in order of priority.

Table 1: Community priorities for transportation corridors.

Corridor
Priority Level
Highway 24 (north of Main)Highest Priority
Highway 24 (south of Main)Highest Priority
West Main StreetHigh Priority
East Main StreetModerate-High
Additional railroad crossing on south side of townModerate
South Railroad Street (CR 317)Moderate
Arizona StreetLow-Moderate
East Arkansas StreetLow-Moderate
Crossman AveLow-Moderate
North Railroad StreetLow-Moderate
Marquette AvenueLow-Moderate


Transportation Concerns

The Town of Buena Vista previously identified a list of transportation concerns during previous planning efforts; community members were asked to rank the types of improvements in order of priority.

Table 2: Community priorities for future improvements.

Transportation ConcernPriority Level
Addition of safe pedestrian crossing along the RR, Highway 24, and Main Street
Highest Priority
Complete sidewalks
Highest Priority
Improving safe routes to school
High Priority
Maintenance of bicycle and pedestrian facilities (painting, restriping, signage)
Moderate-High
Addition of paved multimodal trails
Moderate-High
Development of parking strategy
Low-Moderate


Get Involved

Community input is essential to shaping the future of transportation in Buena Vista.

Residents, businesses, and stakeholders will have opportunities to:

  • Share priorities and concerns

  • Identify safety and connectivity needs

  • Review draft recommendations

  • Help establish implementation priorities

Stay informed by following this project page for updates and engagement opportunities.

Why This Project Matters

Over the past 20 years, Buena Vista has experienced changes in population, visitation patterns, and transportation demand. During that time, the Town has adopted several related plans addressing trails, parking, signage, and growth areas—but these efforts have not yet been integrated into a single, updated transportation roadmap.

Updating the Transportation Master Plan will:

  • Reflect current traffic patterns, land use, and growth trends

  • Address increasing seasonal and recreational travel demand

  • Integrate two decades of adopted plans and studies

  • Establish clear priorities for future transportation investments

  • Support safe, efficient, and accessible mobility for all users

By developing a coordinated strategy now, the Town can reduce long-term infrastructure costs and make proactive, data-informed decisions.

Strategic Alignment

This project directly advances adopted Comprehensive Plan priorities under the Transportation & Connectivity Strategy (TCS):

  • TCS Big Idea 2 / Action 2A: Update the Transportation Master Plan

  • TCS Big Idea 1 / Action 1H: Develop Complete Streets policies and active transportation standards

The TMP Update will translate these adopted policy goals into an actionable implementation roadmap.

What the Plan Will Do (Scope of Work)

The Transportation Master Plan Update will:

  • Replace the existing 2004 Transportation Master Plan

  • Analyze current and future transportation conditions

  • Evaluate roadway, bicycle, pedestrian, and accessibility needs

  • Integrate Complete Streets and multimodal design principles

  • Align transportation planning with adopted Town plans

  • Develop prioritized, implementation-ready recommendations

  • Identify projects to inform future Capital Improvement Planning

Community Benefit

Updating the Transportation Master Plan will help Buena Vista:

  • Improve safety for all users

  • Enhance connectivity between neighborhoods, schools, parks, and businesses

  • Support economic activity and visitor access

  • Increase accessibility for residents of all ages and abilities

  • Guide future infrastructure investments with a clear, data-driven strategy

This effort ensures that transportation decisions are coordinated, fiscally responsible, and aligned with long-term community goals.

Project Overview

Buena Vista is updating its Transportation Master Plan (TMP) to reflect current conditions, community priorities, and future growth. The existing plan was last adopted in 2004 and no longer represents how residents, businesses, and visitors move through Town today.

The updated TMP will become the Town’s primary transportation framework, guiding long-range planning, capital improvement investments, and development decisions. The plan will incorporate Complete Streets principles, ensuring that roads and transportation infrastructure are designed to safely and efficiently serve drivers, pedestrians, cyclists, and individuals of all ages and abilities.

This project is a planning effort only and does not include construction.

What We Heard

Public input was gathered over the course of 12 weeks, collected online through My-BV and in-person during two pop-up events at the library and one open house event held at the Community Center on July 9, 2026. The Town of Buena Vista also heard from local stakeholders during two stakeholder workshops in July. Overall, the Town heard from nearly 300 community members.

Image 1: Community outreach and engagement numbers.


Key Themes & Areas of Need

Community members shared their concerns and ideas for improvement by mapping their comments on the project website, through the 75 comments received, the project team identified 10 key themes or areas of need. The themes below are listed in order of importance based on the number of reoccurring/similar comments.

  • Bicycle & Pedestrian Safety: bike lanes, shared-use paths, complete sidewalks, safer and more visible street crossings, and safer walking/biking routes to schools, parks, trails and the downtown area.
  • Driver Behavior: concerns about excessive vehicle speed and drivers failing to yield to bikes and pedestrians.
  • Parking-Related Safety & Traffic Conflicts: concerns about on-street parking reducing visibility of bikes and pedestrians crossing the street and narrow travel lanes.
  • Dangerous Intersections: concerns about tight turning radii and creating unsafe mering and turning movements, along with the need for additional stop signs or signalized intersections in areas with more traffic.
  • Connectivity & Access: connecting bike lanes to multi-modal networks, need for north-south connectivity, and connecting existing trails and sidewalks.
  • Traffic Calming: need for lower speed limit and traffic calming measures, especially along Highway 24 as vehicles enter town limits.
  • Traffic Flow & Access Management: concerns about multi-direction access into popular businesses and emergency access needs.
  • Streetscape, Maintenance, and Accessibility: maintenance needed on trails, pathways, sidewalks, and bike lanes; reduce tripping hazards and repair uneven sidewalks.
  • Public Transportation: need for more local public transit and expansion of Bustang service.
  • Growth Management, Open Space, & Community Character: future development and transportation projects should continue to preserve open space and wetlands, along with avoiding urban sprawl.

Transportation Corridors

When thinking about future growth and transportation improvements, community members were asked to rank a list of key corridors in order of priority.

Table 1: Community priorities for transportation corridors.

Corridor
Priority Level
Highway 24 (north of Main)Highest Priority
Highway 24 (south of Main)Highest Priority
West Main StreetHigh Priority
East Main StreetModerate-High
Additional railroad crossing on south side of townModerate
South Railroad Street (CR 317)Moderate
Arizona StreetLow-Moderate
East Arkansas StreetLow-Moderate
Crossman AveLow-Moderate
North Railroad StreetLow-Moderate
Marquette AvenueLow-Moderate


Transportation Concerns

The Town of Buena Vista previously identified a list of transportation concerns during previous planning efforts; community members were asked to rank the types of improvements in order of priority.

Table 2: Community priorities for future improvements.

Transportation ConcernPriority Level
Addition of safe pedestrian crossing along the RR, Highway 24, and Main Street
Highest Priority
Complete sidewalks
Highest Priority
Improving safe routes to school
High Priority
Maintenance of bicycle and pedestrian facilities (painting, restriping, signage)
Moderate-High
Addition of paved multimodal trails
Moderate-High
Development of parking strategy
Low-Moderate


Get Involved

Community input is essential to shaping the future of transportation in Buena Vista.

Residents, businesses, and stakeholders will have opportunities to:

  • Share priorities and concerns

  • Identify safety and connectivity needs

  • Review draft recommendations

  • Help establish implementation priorities

Stay informed by following this project page for updates and engagement opportunities.

Why This Project Matters

Over the past 20 years, Buena Vista has experienced changes in population, visitation patterns, and transportation demand. During that time, the Town has adopted several related plans addressing trails, parking, signage, and growth areas—but these efforts have not yet been integrated into a single, updated transportation roadmap.

Updating the Transportation Master Plan will:

  • Reflect current traffic patterns, land use, and growth trends

  • Address increasing seasonal and recreational travel demand

  • Integrate two decades of adopted plans and studies

  • Establish clear priorities for future transportation investments

  • Support safe, efficient, and accessible mobility for all users

By developing a coordinated strategy now, the Town can reduce long-term infrastructure costs and make proactive, data-informed decisions.

Strategic Alignment

This project directly advances adopted Comprehensive Plan priorities under the Transportation & Connectivity Strategy (TCS):

  • TCS Big Idea 2 / Action 2A: Update the Transportation Master Plan

  • TCS Big Idea 1 / Action 1H: Develop Complete Streets policies and active transportation standards

The TMP Update will translate these adopted policy goals into an actionable implementation roadmap.

What the Plan Will Do (Scope of Work)

The Transportation Master Plan Update will:

  • Replace the existing 2004 Transportation Master Plan

  • Analyze current and future transportation conditions

  • Evaluate roadway, bicycle, pedestrian, and accessibility needs

  • Integrate Complete Streets and multimodal design principles

  • Align transportation planning with adopted Town plans

  • Develop prioritized, implementation-ready recommendations

  • Identify projects to inform future Capital Improvement Planning

Community Benefit

Updating the Transportation Master Plan will help Buena Vista:

  • Improve safety for all users

  • Enhance connectivity between neighborhoods, schools, parks, and businesses

  • Support economic activity and visitor access

  • Increase accessibility for residents of all ages and abilities

  • Guide future infrastructure investments with a clear, data-driven strategy

This effort ensures that transportation decisions are coordinated, fiscally responsible, and aligned with long-term community goals.

Page last updated: 18 Aug 2026, 07:41 AM